La Artista Artesia Pilar Park project

King street project site before construction
King street project construction

1000 N. King Street

Construction period

  • Design: January 2023 – July 2023
  • City Council award of construction contract (C.S. Legacy Construction, Inc.): October 17, 2023
  • Construction: December 2023 – June 2024

Project description

The unused right-of-way area located at King Street and Fairview Street was identified as the perfect location for a new pocket park in Santa Ana in 2022. The surrounding Artesia Pilar neighborhood demonstrated support throughout the design and construction phases of the project. The ultimate goals of the project are to beautify the neighborhood, reduce illegal dumping, and provide connectivity between Artesia Pilar and Fairview St.

The project received a $1.49 million grant from the Caltrans Clean California Local Grant Program due to its innovative approach in managing stormwater runoff and beautification of the area. When it rains, stormwater will flow into the park and be captured by two bioretention basins and an underground stormwater infiltration system. Once captured, the stormwater will slowly filter through the soil and eventually down into the local groundwater basin. The park is capable of capturing approximately 117,000 gallons of stormwater per storm! The project will improve water quality in the Santa Ana River watershed, enhance local water supplies, and reduce flooding.

Project components

  • New 10,000 square-foot park
  • 2 bioretention basins
  • Underground stormwater infiltration system
  • Pervious concrete bike path
  • Pedestrian path
  • New lighting
  • Community art features and mural
  • Interpretive signage
  • Drought tolerant landscaping and shade trees

Clean California logo

Funding sources

Total project cost of $2,090,240 with three funding sources:

  1. Grant from the Caltrans Clean California Local Grant Program  $1,491,240
  2. Federal Clean Water Protection Enterprise  $299,000
  3. District 3 Acquisition and Development Funding  $300,000

King Street urban greening project naming

Thank you to everyone for joining us for the official ribbon cutting ceremony on Monday, July 1 at 11 a.m.  and for submitting all your pocket park name suggestions. All online and in person name submissions have been collected at this time. Stay tuned for updates to see if your choice is the winner.

*Update November 20, 2024: The City of Santa Ana Council officially named the King Street Urban greening project La Artista Artesia Pilar Park. Thank you to everyone for your park naming suggestions and helping us find a new for our newest pocket park location.