Search results

Filters

7839 Results Found

CF-6R-MECH - 02 - Solar Domestic Hot Water Systems (SDHW) CF-6R-MECH - 03 - Pool and Spa Heating Systems CF-6R-MECH - 04 - Space Conditioning Systems, Ducts, and Fans CF-6R-MECH - 05 - Indoor Air Quality and Mechanical Ventilation CF-6R-MECH - 06 - Evaporatively Cooled Condensing Units CF-6R-MECH - 07 - Evaporative Coolers CF-6R-MECH -...

WS-1R - Thermal Mass Worksheet WS-2R - Area Weighted Average Calculation Worksheet WS-3R - Solar Heat Gain Coefficient (SHGC) Worksheet

CF-1R - Certificate of Compliance: Residential New Construction CF-1R - ADD Certificate of Compliance: Residential Additions CF-1R - ALT Certificate of Compliance: Residential Alterations

California Energy Commission Hotline: (800) 772-3300 https://www.energy.ca.gov/programs-and-topics/programs/building-energy-efficiency-standards Email Cool Roof Rating Council: (866) 465-2523 California Association of Building Consultants (CABEC): (866) 360-4002

Energy Tips - Cool Roofs 

The City of Santa Ana requires all residential and commercial construction projects to comply with the current California Building Energy Efficiency Standards (Title 24, part 6) in effect. Please note that there are many new requirements for both residential and non-residential projects. The California Energy Commission has all the current compliance forms, complete standards and...

Plans must be reviewed and approved by the following City agencies prior to permit issuance: City Agency                                                                 Phone Number           ...

Transmittal with permit/plan check number referenced Written response to plan check comments Original plan check markup plan set (3) sets of revised plans for architectural and structural plans (2) sets of revised plans for mechanical, electrical, or plumbing plans

Completed Permit Application(s) Completed Plan Check Submittal Form Minimum of Planning approval of the Certificate of Occupancy (for non-residential projects if applicable) Submittal of plans and specifications Applicable documentation including structural calculations and Title 24 energy calculations (2 sets of each) Mechanical, electrical and plumbing plans, where required, must be submitted separately

The number of plans required varies by project. Click here for a list of plan types and the number of sets required. For projects requiring fire review by the Orange County Fire Authority (OCFA), an additional (2) sets and an electronic copy are required for OCFA per OCFA handout.

Plans shall be on a minimum 18" x 24" paper for archiving Plans and specifications shall be drawn to scale Plans shall be of sufficient clarity to indicate the location, nature, and extent of the work proposed Plans shall show in detail that the project will conform to the provisions of the applicable building codes...

In order for a construction permit to be issued and the work to be properly inspected, plans must be prepared and submitted to the city for review and approval.  Plan check involves review of the submitted plans by various city departments to meet its respective code requirements.  Once the plans have been approved by all...

Close window