Warner Avenue is a regionally significant arterial roadway, providing east-west travel through the City. To enhance safety, mobility and overall quality of life in the neighborhood, the City is Santa Ana proposes to improve and widen the 1-mile segment of Warner Avenue from Main Street to Grand Avenue from four to six lanes. When completed, the proposed improvements will improve pedestrian and bicycle mobility and safety while creating a consistent major arterial facility as designated in the City’s General Plan Circulation Element and in the County of Orange’s Master Plan of Arterial Highways. The recommended alignment was selected to maximize benefits while minimizing overall impacts to the community.
Project Scope, Funding, & Status
-
Main Street to Oak Street (Phase 1)
- Scope: Improvements include widening Warner Avenue between Main Street and Oak Street from 2 to 3 lanes in each direction. Improvements also includes adding additional left turn lanes at Main Street, bus turn outs, raised medians, and bike lanes along Warner Avenue between Main Street and Oak Street.
- Funding: OCTA Measure M2 Grant, City of Tustin Fund, M2 Fair share, SB1 RMRA and a variety of local funds.
- Status: This segment is currently in the construction stage and is expected to be completed in the fourth quarter of 2025. See Public Works webpage for complete project schedule.
-
Oak Street to Grand Avenue (Phase 2)
- Scope: Improvements include widening Warner Avenue between Oak Street and Grand Avenue from 2 to 3 lanes in each direction. Improvements also include adding additional left turn lanes at Grand Avenue, bus pads, raised medians, and a protected bike lane.
- Funding: OCTA Measure M2 grant, City of Tustin Fund, M2 Fair share, CA Water resources grant, and a variety of local funds.
- Status: This segment is currently in the design stage and construction is scheduled to start in the fourth quarter of 2025. See Public Works webpage for complete project schedule.
Project objectives
The proposed scope for Warner Avenue Improvements and Widening project from Main Street to Grand Avenue includes, but is not limited to:
- Increase safety for pedestrians, bicyclists, and motorist.
- Reduce traffic congestion and provide traffic calming.
- Improve storm water drainage, water quality, and air quality.
- Undergrounding of utilities.
- Greater public access with ADA improvements and dedicated bike lanes.
- Compliance with Complete Streets Act (accommodates all users including pedestrians, bicyclists, transit users, and motorists).
- Enhanced community beautification with significant public investment.
Project benefits
The proposed improvements have been designed utilizing Complete Streets principals to provide safe, comfortable, and convenient travel for all users – pedestrians, bicyclists, transit riders, and motorists.
- Safety: The narrow travel lanes and raised median will deter speeding through the project segment; Landscape parkways will provide a safe buffer between pedestrians and motorists; Bicyclists will travel in a designated bike lane instead of mixing flow with vehicles and pedestrians; Safety enhancement are proposed at the rail road crossing; Collisions are potentially reduced with controlled left movements and improved traffic flow.
- Accessibility: Installation of wider sidewalks, ADA compliant curb ramps, and bike lanes will greatly improve accessibility for pedestrians and bicyclists.
- Traffic Flow: In the year 2020 this segment of Warner Avenue is projected to have a level of service (LOS ) rating of “F” (a road in a constant traffic jam). However, with the proposed improvements, the segment will operate at a LOS “A” (free flow traffic).
- Widening: The roadway will also eliminate the existing bottleneck occurring at both ends of the project limits where six lanes merge to four lanes. Ultimately, the proposed Warner Avenue improvements will provide safe mobility for all users while improving traffic flow.
Additional Information
- Warner Avenue Improvements Project FAQs
- Warner Avenue Improvements Project Relocation Plan – Phase 1
- Warner Avenue Improvements Project Relocation Plan – Phase 2
- Warner Avenue Improvements Project Notice of Availability of Draft EIR
- Warner Avenue Improvements Project Final Environmental Impact Report
Project Outreach
- 04/23/24 Presentation
- 10/18/23 Presentation Flyer
- 02/13/23 Presentation Flyer
- 03/14/22 Presentation
- 06/28/21 Presentation
- 11/30/20 Presentation
- 01/29/20 Presentation
- 07/17/19 Presentation
- 10/16/18 Presentation Underground District Presentation
- 04/25/18 Presentation
- 04/17/18 City Council Meeting Staff Report Item 75B, City Council Meeting Staff Report Item 25F
- 10/24/17 Presentation
- 09/01/15 City Council Meeting Staff Report Item 75B
- 07/23/15 Presentation
- 04/08/15 Presentation
- 02/03/15, 02/07/15 Presentation
Warner Ave. Improvements Ph. 1 Construction Contacts
Construction Manager
Alex Olmos
Email: aolmos@santa-ana.org
Phone: 714-647-5629
Senior Construction Manager
Edward Torres
Email: etorres@santa-ana.org
Phone: 714-647-5018
PWA Construction
Email: PWAConstruction@santa-ana.org
Phone: 714-647-5074
Warner Ave. Improvements Design Contacts
David Ramirez
Email: warner@santa-ana.org
Phone: 714-647-5013